Emerald Ash Borer (EAB)

   

If you have ash trees, stop and learn more before you act.

The potential threat of emerald ash borer (EAB) is real; however, acting without
understanding the specific threat to your trees, regulations and
quarantines, and your options, could cause the unnecessary loss of
treasured shade trees, or loss of substantial income from your woodlot.
This Asian beetle infests and kills North American ash species (Fraxinus
sp.) including green, white, black and blue ash. Thus, all native ash trees
are susceptible. Adult beetles leave distinctive D-shaped exit holes in the
outer bark of the branches and the trunk. Adults are roughly 3/8 to 5/8 inch
long with metallic green wing covers and a coppery red or purple
abdomen. They may be present from late May through early September
but are most common in June and July. Signs of infection include tree
canopy dieback, yellowing, and browning of leaves.
Most trees die within 2 to 4 years of becoming infested. The emerald ash
borer is responsible for the destruction of over 50 million ash trees in the
U.S. since its discovery in Michigan. For more information and pictures,
see http://www.dec.ny.gov/animals/7253.html
If you think you have EAB, call the Department's EAB and Firewood
hotline at 1-866-640-0652.

http://www.emeraldashborer.info/

On June 17, 2009, Emerald Ash Borer was confirmed in New York.
(Official Press Release)

CLCA News & Events 7/4/2017

July 4th Water Level Update

As of 7AM July 4, lake level at Green Lake Bridge was 13 inches above summer normal, and down 9 inches over past 24 hours. 
The DEC opened the dam to 22 inches on the morning of July 3, after opening it to 10 inches on July 2. At present rate, normal lake level is expected by late Thursday July 6.
Bill Fielding, on behalf of the CLCA, urged DEC on July 1 to open the dam 22 to 25 inches. A further urgent request was made at 7AM on July2 and DEC opened the dam to 10 inches that afternoon.
At 6PM on July 2 CLCA again asked DEC to open to 20 inches, and then at 7AM on July 3 upped the recommended opening to 22 inches. DEC finally opened the dam to that level at approximately 9AM July 3.
Further updates will be sent if warranted.
Read More Read ALL

Local News 8/21/2017

What's Happening Monday, Aug. 21

Highlights include track giveaway, Restaurant Week...

Read More